4. The monitor performs the PT test AND 2 quality control tests (normal and therapeutic) simultaneously, and determines whether the controls are within preset limits. If they are, strip integrity is verified, and the monitor reports the PT test result. If they are not, the monitor displays an ERROR message.
5. The test results are displayed in less than 2 minutes as an INR only, PT seconds and INR, or INR, PT, and QC, whichever the user prefers. |